The fireplace is now in position and the block work for the new tower is being laid out on the over side of the garden.
Short URL: http://bit.ly/f2pjxl
You Are Here: Home » Gallery » 8th February 2011
The fireplace is now in position and the block work for the new tower is being laid out on the over side of the garden.