The area in front of the bell tower and cloister is levelled in readiness for the York paving stone. Tim and David discuss the construction of the crypt.
Short URL: http://bit.ly/i2kzkP
You Are Here: Home » Gallery » 26th April 2010
The area in front of the bell tower and cloister is levelled in readiness for the York paving stone. Tim and David discuss the construction of the crypt.